An evening built for industry leaders
Insights, customer perspectives and conversations around digital transformation in the nuclear and power sector.
Ready for the regulator from day one
How project teams keep the documentation trail that nuclear safety reviews require, without adding manual work.
See a power plant come together in 3D
A live walkthrough showing how models, P&IDs and documents stay in sync as design changes move through a nuclear or thermal project..
Meet the people who shape India’s power projects
Owner-operators, EPCs and technology partners in one room. Talks that usually take months to arrange can start over a single evening.
Handover your operations team can trust
Practical ways to move design data from EPC to owner-operator, so commissioning starts with complete and current information.
Hear it from your peers
Power sector project leads share what changed when they moved plant information into one place, and what they would do differently.
Networking dinner
Carry on over cocktails and dinner with the speakers and your peers..
Evening at a glance
The detailed program is being finalised. Here is a preview of the key sessions.
Ten times the nuclear capacity, built on plant information you can trust
India plans to grow its nuclear capacity from around 9 GW today to 100 GW by 2047. Each new project brings more EPCs, suppliers and engineering teams into the same program. Every one of these plants will run for decades. Design decisions made in the next few years have to stay accurate and auditable long after the project team has moved on.
That challenge is what this evening is about. Our India team works on it every day with owner-operators and EPCs, and the Nuclear Summit this October is where we want to take the conversation further.
Join us at the Cadmatic India Nuclear Summit 2026
An evening focused on digital engineering, customer experience and the future of nuclear and power projects.